Products catalog

  • Modular three-phase electricity meter | 5(80) A | 3×230/400 V | 1 tariff | pulse output | MID | IP20 | DIN | THORGEON 01006

    Code: 01006

    Direct-connected three-phase electronic meter up to 80 A with MID approval stated by the manufacturer. Records active energy (kWh), has an 800 imp/kWh output and takes 4 DIN modules – suited to tenant and department sub-billing.

  • Modular three-phase electricity meter | 5(80) A | 3×230/400 V | 1 tariff | pulse output | MID | IP20 | DIN | THORGEON 01006

    THORGEON 01006 is a modular three-phase electronic meter connected directly up to 80 A. The manufacturer states MID (Measuring Instruments Directive) approval, so the meter is suitable not only for technical monitoring but also for landlord–tenant sub-billing.

    Key point:
    When electricity costs have to be recharged to a tenant, department or neighbour, a MID approved device gives the readings a legal basis. The 01006 delivers MID at an accessible level without unnecessary features: 80 A direct connection, a clear kWh reading and an 800 imp/kWh output.
    Max. current
    80 A
    Approval
    MID
    Accuracy class
    B
    Pulses
    800 imp/kWh
    ℹ
    Bidirectional metering
    The manufacturer does not state that the meter records imported and exported energy separately. If energy exported to the grid must be metered separately, choose a clearly bidirectional model, e.g. EL-TVPS3-80T.

    Communication interfaces and integration

    Electrical pulse output (800 imp/kWh)
    Higher resolution than 400 imp/kWh models – more accurate counting of small loads in a PLC, BMS or data logger.
    Local LCD display
    Readings are taken at the board; there is no RS485, M-Bus or Wi-Fi interface.

    How it works

    The meter mounts on a 35 mm DIN rail; three phases and neutral are connected directly – no current transformers are needed up to 80 A.

    The electronic measuring circuit records active energy on three phases; each kWh equals 800 pulses at the output.

    The LCD shows the accumulated kWh value which, thanks to MID, can be used for billing between parties.

    Why choose the THORGEON 01006?
    It is one of the simplest ways to put MID approved metering on a three-phase line: no CTs, no programming, a 4-module housing. It fits where consumption must be recharged legitimately but remote reading is not required.

    Technical specifications

    Product type Modular three-phase electronic electricity meter
    Manufacturer / model THORGEON 01006
    Connection Direct (no current transformers)
    Base / maximum current 5 A / 80 A
    Rated voltage 3×230/400 V (230 V phase–N)
    Frequency 50–60 Hz
    Accuracy class B
    MID Yes (Measuring Instruments Directive, per manufacturer)
    Tariffs 1 (internal control)
    Measured quantities Active energy (kWh)
    Pulse output Electrical, 800 imp/kWh
    Display Digital LCD
    Built-in battery Yes
    Mounting DIN rail, 4 modules
    Dimensions (W×H×D) 75 × 105 × 65 mm
    Weight 372 g
    Degree of protection IP20
    Warranty 24 months

    Main functions

    • MID approval – readings usable for tenant billing
    • Direct connection up to 80 A – no current transformers
    • Active energy metering – clear kWh reading
    • 800 imp/kWh pulse output – higher resolution for automation
    • LCD display with battery – readings visible at the board
    • 4-module housing – fits a standard DIN enclosure

    How does it differ from similar models?

    THORGEON 01002 Same 80 A current, basic model without MID; the 01006 has MID approval.
    THORGEON 01007 80 A and MID, plus 2 tariffs and RS485 Modbus; the 01006 is simpler, with no digital interface.
    THORGEON 01003 Up to 100 A but without MID; choose the 01006 when billing-grade metering is required.
    Eastron SDM72DMID 100 A, MID, S0 1000 imp/kWh, IP51 front; the 01006 goes up to 80 A, IP20.

    Where is it used?

    • Metering of rented offices or retail units
    • Allocation of common lines in apartment buildings and terraced houses
    • Recharging costs to company departments or workshops
    • Splitting a shared supply between neighbours
    • EV charging circuit metering
    • Three-phase lines in farms and warehouses

    Use by need

    Landlords.
    MID metering that supports a justified invoice to the tenant.
    Electricians.
    Simple direct installation up to 80 A, no CTs.
    Building administrators.
    Clear cost allocation between users.

    Practical use

    If a building has three tenants with three-phase supplies who must be invoiced for actual consumption, install a THORGEON 01006 for each in the common board – the MID approved readings are transferred to the invoices every month.

    Pros

    • MID approval stated by the manufacturer
    • Direct connection up to 80 A
    • 800 imp/kWh pulse output
    • Compact 4-module housing
    • 24-month manufacturer warranty

    Cons / limitations

    • 80 A maximum current (up to 100 A – THORGEON 01003 without MID or Eastron SDM630-MT with MID)
    • No RS485 / Wi-Fi – for remote reading choose THORGEON 01007
    • Single tariff
    • Bidirectional metering not stated by the manufacturer

    Safety and installation notes

    • Installation by a qualified electrician only, with the supply disconnected
    • Upstream circuit breaker sized to the cable and not exceeding 80 A
    • Choose conductor cross-section and tightening torque per the manual
    • IP20 – install only in a closed enclosure in a dry room
    • After installation record the initial reading and the meter serial number

    Quick selection guide

    Direct up to 80 A
    MID
    1 tariff
    800 imp/kWh
    A good fit when you need:
    • Billing-grade (MID) three-phase metering
    • Cost allocation to tenants
    • A simple solution without a digital interface
    Check before use:
    • That maximum line current does not exceed 80 A
    • That remote reading is not needed (otherwise – 01007)
    • That MID meets your local billing rules
    Important reminder: A MID meter is suitable for internal billing but does not replace the grid operator's main billing meter.

    FAQ

    Is the meter MID approved?
    Yes, the manufacturer states MID (Measuring Instruments Directive) approval.
    What is the maximum current?
    80 A, direct connection.
    How many pulses per kWh?
    800 imp/kWh.
    Can it be read via Modbus?
    No, that is what the THORGEON 01007 is for.
    Does it measure energy exported to the grid?
    The manufacturer does not state bidirectional metering, so choose a bidirectional model for export, e.g. EL-TVPS3-80T.
    What is the warranty?
    The manufacturer specifies a 24-month warranty.

    THORGEON 01006 three-phase MID meter 80 A

    Direct-connected three-phase MID electricity meter 5(80) A, 3×230/400 V, class B, 800 imp/kWh, 4 DIN modules – for tenant and department sub-billing.

    Illustrative image may have been created using AI. The appearance of the product may differ slightly from the image shown. Please refer to the technical specification.
  • Alternative products

  • Subscribtion to new arrivals

    privacy policy

    Information