ATS guide: how to choose a backup power transfer switch
A transfer switch is not chosen by generator power but by the building's supply: number of phases, rating of the main circuit breaker, earthing system and whether the generator has automatic start. Below – quick choice by situation, how it works, selecting poles and current, the most common mistakes with diagrams and answers to questions.
Colour meaning: ■ information · ■ benefit, solution · ■ ⚠ check · ■ ⚡ safety, mistakes
What do you need? Quick choice
|
Situation |
Solution |
Where to look |
|
House or cottage, single-phase supply, generator up to ~8 kW |
2P modular ATS 63–100 A on DIN rail – switches L and N |
TXATS 2P 63 A, TOATS 2P 63 A, LMS1 2P 100 A |
|
House, farm or workshop, three-phase supply, three-phase generator |
4P modular ATS 63–125 A – switches L1, L2, L3 and N |
G2R 4P 63 A, TXATS 4P 100 A, TXATS 4P 125 A |
|
The generator has automatic start and must be started when the grid fails |
ATS controller with a generator start contact and time delays |
HAT310 controller, Y-702 panel controller |
|
A ready-made set is needed for a small generator |
ATS controller box 3–10 kW, 230 V or 380 V |
5 kW 230 V, 10 kW 230 V, 10 kW 380 V |
|
The generator is used rarely and started by hand |
Manual 1-0-2 changeover switch (MTS) – position 0 disconnects both sources |
1-0-2 2P 63 A, 1-0-2 changeover switches / modular 1-0-2 (DIN) |
|
Hybrid solar inverter with a backup (EPS) output and the grid |
PV ATS – transfers the load between the inverter output and the grid |
PV 2P 63 A, PV 4P 63 A, PV 4P 100 A |
|
Grid voltage fluctuates – switching is needed not only on power loss |
ATS with adjustable over- and undervoltage limits |
3P 63 A with LCD, three-phase 100 A |
|
A single-phase load must automatically use a healthy phase out of 3 |
Phase selector with protections (not a three-phase load ATS) |
phase selector 150 A |
|
Single-phase load with 3–4 sources |
Multi-input ATS with source priority |
3 inputs, 4 inputs |
|
Commercial or production site, supply 100–630 A |
Panel ATS for higher currents, cabinet-mounted |
NXZ 4P 250 A, NXZM 3P 400 A, SLQ1 4P 400 A |
|
Large site or substation, 1000–1600 A |
Power ATS 1000–1600 A |
BYQ1 4P 1600 A, SLQ1 4P 1600 A |
A correctly selected ATS works without a person
-
Automatic transfer – when the grid fails, the load moves to the backup source without manual work.
-
The generator is started and stopped automatically – when the ATS or controller has a start contact.
-
Grid and generator are never connected together – mechanical and electrical interlock.
-
Return to the grid only on stable voltage – a delay prevents reaction to short dips.
How an ATS works with a generator
1. Grid fails
→
2. Delay 3–10 s
→
3. Start signal to the generator
→
4. Voltage and frequency stable
→
5. Load – to the generator
→
6. Grid back, delay
→
7. Load – to the grid, generator cools down and stops
Delays are set in the controller. A simple modular ATS without a controller only transfers the load between two voltages that are already present – it does not start the generator. For that you need an ATS with a start contact or a separate ATS controller, and the generator must have an electric starter and a remote start input.
ATS, MTS or controller – what is the difference
|
Type |
How it works |
Suitable for |
|
Manual changeover switch (MTS) 1-0-2 |
Operated by a handle; position 0 disconnects both sources |
Occasional generator use, simplest solution |
|
Modular ATS (DIN) |
Built-in controller and drive; 2P, 3P, 4P; up to 125 A |
Houses, farms, small sites |
|
Panel ATS |
Motor drive, controller with display; 100–1600 A |
Commercial and industrial sites |
|
ATS controller |
Monitors voltage, starts and stops the generator, controls the switch or contactors |
When the generator has automatic start |
|
PV ATS |
Transfers between the inverter backup output and the grid |
Solar plants with a hybrid inverter |
PC or CB class (IEC 60947-6-1)
PC class – switching device
Makes and withstands short-circuit current but does not break it. Circuit breakers or fuses specified by the manufacturer are required upstream – their type and rating are given in the switch instructions.
CB class – with circuit breakers
Built from motor-operated circuit breakers – overload and short-circuit protection is already inside, so separate upstream protection is usually not needed.
Check the class and utilisation category (AC-31B, AC-33A, etc.) in the manufacturer's datasheet. If the class is not stated, plan the protection as for PC class.
2P, 3P or 4P?
|
Installation |
Poles |
Why |
|
Single-phase supply 230 V |
2P (L + N) |
Both L and N are switched – the grid and generator neutrals are not connected together |
|
Three-phase supply 400 V with N (TN-S, TN-C-S) |
4P (L1, L2, L3, N) |
N is switched together with the phases – no parallel N and PE paths, RCDs work correctly |
|
Three-phase load without N (motors only) |
3P |
N is not used – rare in homes |
|
Three-phase supply but a single-phase generator |
2P for single-phase circuits |
A single-phase generator cannot supply three-phase loads – separate the essential single-phase circuits for backup |
⚠ If the generator's neutral is bonded to PE (a common case), choose a 4P ATS for a three-phase installation. 3P is suitable only where the design specifies otherwise.
→ 2
Choosing the current
How to calculate: the ATS rated current must be not lower than the rating of the main circuit breaker – on grid supply the whole load of the building flows through it. The generator current is usually lower: single-phase I = P / 230 V, three-phase I = P / (√3 × 400 V × cos φ). E.g. three-phase supply 3×32 A → 4P ATS 63 A; 10 kW generator, cos φ 0.8 → I ≈ 18 A. If the generator is weaker than the supply, feed only essential circuits from it (a separate backup sub-board) or limit the load.
For motors, compressors and heat pumps check the utilisation category: AC-33 – mixed load including motors, AC-31 – resistive or slightly inductive load only.
What generator and ATS do you need: load calculation
The ATS is selected according to the building's supply connection, and the generator according to what you want to power during an outage. The most common mistake is adding up the ratings of all appliances. What matters more is what will run at the same time and how much current motors will draw when starting.
|
Load |
Typical power |
Starting current |
Note |
|
Gas or pellet boiler with circulation pump |
100–300 W |
~1× |
Gas boilers are sensitive to the N–PE connection (see FAQ) |
|
Fridge, freezer |
100–200 W |
3–5× |
Compressor switches on periodically |
|
Borehole or booster pump |
0.75–1.5 kW |
3–6× |
Usually determines the generator size |
|
LED lighting, internet, alarm |
50–300 W |
~1× |
Always worth including in the backup |
|
Air-to-water heat pump |
2–8 kW |
inverter ~1×, conventional 3–6× |
Check the manufacturer's data |
|
Electric water heater |
1.5–3 kW |
1× |
Usually excluded from the backup |
|
Electric hob, oven |
3–9 kW |
1× |
Better to limit the backup load |
|
Garage door, air compressor |
0.3–2 kW |
3–6× |
Run only briefly |
Values are indicative; exact data is on the appliance rating plate. With direct-on-line starting, motor starting current often reaches about 6 times the rated current.
How to calculate in 4 steps
-
1. Add up the power of loads running at the same time (kW).
-
2. Add the starting surcharge of the largest motor: its power × (starting multiple − 1).
-
3. Convert to kVA: generator power is stated in kVA, and kW = kVA × 0.8.
-
4. Leave a margin: the continuous load should not exceed 70–80 % of the generator's rated power.
Example: country house with a borehole and a gas boiler
Boiler 0.2 kW + fridge 0.15 kW + borehole pump 1.1 kW + lighting and internet 0.35 kW = 1.8 kW continuous load. When the pump starts (5×), an extra 1.1 × 4 = 4.4 kW is drawn momentarily, so the peak is about 6.2 kW.
A generator with about 6.5–7 kW maximum power is suitable: it handles the peak, and the continuous load is only ~30 %. The supply is single-phase 32 A, so the ATS is TXATS 2P 63 A or TXATS1 2P 63 A (CB).
☝ Three-phase generator: usually only about one third of its power can be loaded on a single phase. A 9 kW three-phase generator is fine for a single-phase 3 kW heater, but not for a 6 kW single-phase load. Distribute loads evenly across the phases.
Whole house or essential circuits only: backup sub-panel
|
Solution |
How it is installed |
Advantages |
Disadvantages |
|
Whole-building backup |
ATS after the main switch, the entire panel is transferred |
Everything works, no circuits need to be moved |
Requires a larger generator and an ATS rated for the full supply current |
|
Priority backup sub-panel |
Essential circuits (boiler, pump, fridge, lighting) are moved to a separate sub-panel fed by the ATS |
Smaller generator and ATS, lower fuel consumption, no generator overload |
Circuits must be rewired in the panel; not everything works on backup |
For most houses and country homes, the most rational choice is a priority sub-panel with a 2P or 4P 63 A ATS and a 5–10 kW generator. Commercial sites with full backup need panel-mounted ATS rated 100–1600 A.
Automatic start: controller, signals and delays
For everything to happen without a person when the power fails, the generator must have an electric starter and a remote start input, and the system must have a controller that operates it.
|
Start method |
How it works |
Suitable for |
|
2-wire start |
The controller's dry contact closes – the generator starts and runs by itself; the contact opens – it stops |
Most generators with an auto-start module |
|
3-wire start |
Separate signals: ignition, starter and stop. The controller manages the cranking attempts itself |
Generators without their own start module |
|
Start from a hybrid inverter |
The inverter closes the G-Start contact based on battery state of charge (SOC) |
Solar power plants with batteries |
|
Delay |
Typical value |
Purpose |
|
Mains failure confirmation |
3–10 s |
So that short flickers do not start the generator unnecessarily |
|
Generator warm-up before loading |
10–30 s |
Voltage and frequency stabilise, the engine does not stall |
|
Return to mains |
30–300 s |
Confirms that the mains has returned stably |
|
Generator cool-down without load |
60–180 s |
The engine cools down before stopping |
|
Periodic test run |
every 1–4 weeks, 10–15 min |
The generator and battery are checked before a real outage |
Solutions by application:
|
Situation |
Solution |
Where to look |
|
Small generator, ready-made kit needed |
ATS controller box with start and transfer |
ES-TD-ATS5, ES-TD-ATS10, ES-TD-ATS51, ES-TD-ATS101 |
|
Three-phase mains, single-phase generator |
Controller monitoring 3 mains phases and 1 generator phase, 16 A relays |
ES-HAT310 |
|
On the panel door, with display and RS485 |
Panel-mounted digital controller |
ES-Y-702 |
|
All in one DIN module |
Digital ATS with protections and metering |
ES-JMRD-DTX, ES-JMRD-PS5X/150A |
Generator, solar inverter and batteries
A hybrid inverter with a battery is already a backup source in itself: when the mains fails, it transfers the load to the LOAD (EPS) output within a few milliseconds. A generator is needed here when the battery is not enough for a long outage.
|
Connection method |
How it works |
What to check |
|
Generator to the inverter's GEN input |
The inverter starts the generator itself via the G-Start contact and uses it to charge the batteries. No separate ATS is needed |
Whether the inverter has a GEN input and what generator power it accepts |
|
Generator via ATS to the inverter's GRID input |
The ATS switches the inverter input between mains and generator |
Whether the manufacturer allows a generator on GRID. Export must be disabled in generator mode |
|
PV ATS at the inverter output |
When the inverter shuts down (empty battery or fault), the load is transferred directly to the mains |
ESTXATS-63PV-2P, ESTXATS-63PV-4P, ESTXATS-125PV/4P, ES-HGLD-100/4 |
⚡ Inverter and generator: advice from Fazė
-
Never connect the inverter's LOAD (EPS) output directly to the mains or a generator – only via a dedicated PV ATS.
-
A generator cannot accept energy back. When running on the generator, inverter export must be disabled, otherwise the generator may be damaged.
-
Set the generator power in the inverter according to the manufacturer's instructions and leave a 20–30 % margin.
-
Connecting a solar power plant in parallel with the grid makes you a prosumer and requires connection conditions from ESO (the Lithuanian distribution network operator).
⚡ Safety and requirements: why the generator must never feed back into the grid
Through a supply that has not been disconnected, generator voltage enters the distribution network. The transformer steps it up to high voltage, and line workers may be working on the line believing it is dead. When the mains returns, unsynchronised sources are connected together and can damage the generator and the installation.
|
Requirement |
How it is implemented |
|
Sources are never connected to each other |
ATS or 1-0-2 changeover switch with mechanical interlock: only one source is on at any time |
|
The mains is disconnected on all poles |
2P (L and N) for single-phase sites, 4P (L1, L2, L3 and N) for three-phase sites |
|
Overload and short-circuit protection |
PC-class ATS – circuit breakers upstream on both sides. CB class has built-in protection |
|
Earthing and N–PE |
A single N–PE bonding point according to the system design, otherwise RCDs malfunction |
|
Installation and documentation |
Connection is carried out by a certified electrician; changes are marked on the panel diagram |
☝ For companies and institutions: the Lithuanian General Rules for Electrical Installations, clause 46.1, require that Category I consumers, for whom a power interruption endangers human life or the environment, be supplied from two independent sources with automatic transfer, and have an additional autonomous source for emergencies, e.g. a generator. Such sites need an ATS with a controller and a design project.
Selection matrix: the entire ATS group
All switches and controllers in the group by type. PC-class devices need separate upstream protection, while CB-class devices already have it (IEC 60947-6-1).
|
Series |
Type |
Poles |
Current |
Features |
Products |
|
Manual changeover switches (MTS) |
|
TAXNELE TX219G |
Manual I-0-II, DIN |
2P |
63 A |
Position 0 disconnects both sources |
ES-TX219G-63 |
|
Modular ATS for single-phase supply (DIN) |
|
TAXNELE TXATS |
Automatic, PC |
2P |
63 / 100 / 125 A |
Built-in controller |
ES-TXATS-63-2P, ESTXATS-100-2P, ES-TXATS-125/2P |
|
TAXNELE TXATS1 |
Automatic, CB |
2P |
63 / 125 A |
With overload and short-circuit protection |
ESTXATS1-63-2P, ESTXATS1-125-2P |
|
TAXNELE TXATS2 |
Automatic |
2P |
63 A |
With handle for manual operation |
ESTXATS2-63-2P |
|
TAXNELE TXATS3 |
Compact, PC |
2P |
63 A |
Narrow width in the panel |
ESTX-2P63 |
|
TONGOU TOATS |
Compact, PC |
2P |
63 A |
Narrow width in the panel |
TOATS-2-63 |
|
LVMA LMS1 |
Automatic, PC |
2P |
100 A |
220 V |
ES-LMS1-100GA |
|
SaiLingsi SLQ6 |
Automatic, PC |
2P |
63 A |
230 V |
ES-SLQ6-63A/2 |
|
EL-GM |
Modular automatic |
2P |
63 A |
230 V |
EL-GM63/100 |
|
GRL DNH41 |
Automatic with display |
1P+N |
10–80 A |
Shows voltage and current |
ESDNH41 |
|
JMRD-PN3 / PN4 |
Automatic with protections |
2P |
100 A |
3 or 4 inputs (multiple sources) |
ES-JMRD-PN3, ES-JMRD-PN4 |
|
Modular ATS for three-phase supply (DIN) |
|
TAXNELE TXATS |
Automatic, PC |
3P / 4P |
63 / 100 / 125 A |
Built-in controller |
ES-TXATS-63-3P, ES-TXATS-63-4P, ESTXATS-100-4P, ES-TXATS-100/4P, ES-TXATS-125/4P |
|
TAXNELE TXATS1 |
Automatic, CB |
4P |
63 / 125 A |
With protections |
ESTXATS1-63-4P, ESTXATS1-125-4P |
|
TAXNELE TXATS2 / TXATS3 / TXATS4 |
Automatic, PC |
4P |
63 A |
TXATS2 with handle, TXATS3 and TXATS4 compact |
ESTXATS2-63-4P, ES-TOATS-2, ES-TXATS4-63/4P |
|
GEYA G2R |
Automatic, PC |
4P |
63 A |
230 V |
ES-G2R-4-63 |
|
RP6-63L |
Automatic, CB |
4P |
63 A |
Display and buttons |
ES-RP6-63L/4P |
|
JOTTA JTQ3 / JTH2 |
Automatic, PC |
4P |
63 / 100 A |
JTH2 with O-I-II positions |
ESJTQ3-125, ESJTH2, ESJTH21 |
|
BEYQH3 |
Automatic with voltage protection |
3P |
63 A |
Adjustable voltage limits, LCD |
ES-BEYQH3-63A |
|
EL-GM4P |
Modular automatic |
4P |
100 A |
230 V |
EL-GM4P/100 |
|
JMRD-DTX / PS5X |
Digital with protections |
4P / – |
100 / 150 A |
PS5X with energy metering |
ES-JMRD-DTX, ES-JMRD-PS5X/150A |
|
ABB OTM C21D |
With motor operator, 1-0-2 |
3P / 4P |
63 / 125 A |
380–415 V, IP20 |
3P 63 A, 4P 63 A, 4P 125 A |
|
ABB OXB |
Digital, 1-0-2 |
4P |
200 A |
200–415 V |
4P 200 A |
|
Panel-mounted ATS 63–1600 A |
|
CHINT NXZ |
Automatic, PC |
4P |
125 / 250 / 630 A |
400/415 V |
ES-NXZ-125/4P, ES-NXZ-250/4P, ES-NXZ-630/4P |
|
CHINT NXZM |
Automatic, CB |
3P |
125–800 A |
400/415 V, with protections |
ES-NXZM-160S-125, ES-NXZM-160S-160, ES-NXZM-160S-250, ES-NXZM-160S-400, ES-NXZM-160S-630, ES-NXZM-160S-800 |
|
SaiLingsi SLQ1 |
Automatic |
3P |
100–1600 A |
3-phase monitoring |
ES-SLQ1-100A/3, ES-SLQ1-160A/3, ES-SLQ1-250A/3, ES-SLQ1-400A/3, ES-SLQ1-630A/3, ES-SLQ1-1000A/3, ES-SLQ1-1250A/3, ES-SLQ1-1600A/3 |
|
SaiLingsi SLQ1 |
Automatic |
4P |
100–1600 A |
3-phase monitoring |
ES-3SLQ1-100A/4, ES-3SLQ1-160A/4, ES-3SLQ1-250A/4, ES-3SLQ1-400A/4, ES-3SLQ1-630A/4, ES-3SLQ1-1000A/4, ES-3SLQ1-1250A/4, ES-3SLQ1-1600A/4 |
|
SaiLingsi SLQ1 |
Automatic |
4P |
100–1600 A |
1-phase monitoring, 2 inputs – 2 outputs |
ES-2SLQ1-100A/4, ES-2SLQ1-160A/4, ES-2SLQ1-250A/4, ES-2SLQ1-400A/4, ES-2SLQ1-630A/4, ES-2SLQ1-1000A/4, ES-2SLQ1-1250A/4, ES-2SLQ1-1600A/4 |
|
SaiLingsi SLQ1 |
Automatic |
4P |
100–1600 A |
1-phase monitoring |
ES-SLQ1-100A/4, ES-SLQ1-160A/4, ES-SLQ1-250A/4, ES-SLQ1-400A/4, ES-SLQ1-630A/4, ES-SLQ1-1000A/4, ES-SLQ1-1250A/4, ES-SLQ1-1600A/4 |
|
BYQ1 |
Digital |
4P |
1600 A |
400 V AC |
ES-BYQ1-1600/4 |
|
EL-ATS |
Panel-mounted automatic |
4P |
63 A |
230/380 V |
EL-ATS-63/4P |
|
For solar power plants (PV ATS) |
|
TAXNELE TXATS-PV |
Inverter – mains, DIN |
2P / 3P / 4P |
63 / 125 A |
Load transfer between inverter output and mains |
ESTXATS-63PV-2P, ESTXATS-63PV-3P, ESTXATS-63PV-4P, ESTXATS-125PV/4P |
|
HGLD-100 |
Panel-mounted PV |
4P |
100 A |
400 V AC/DC |
ES-HGLD-100/4 |
|
Controllers and ready-made kits |
|
SmartGen HAT310 |
ATS controller, DIN |
– |
16 A relays |
Mains 3 phases, generator 1 phase, start |
ES-HAT310 |
|
Y-702 |
Panel-mounted digital controller |
– |
– |
230 V, RS485 |
ES-Y-702 |
|
TD-ATS 230 V |
Controller box with start |
– |
3–10 kW |
For single-phase generators |
ES-TD-ATS3, ES-TD-ATS5, ES-TD-ATS6, ES-TD-ATS7, ES-TD-ATS8, ES-TD-ATS10 |
|
TD-ATS 380 V |
Controller box with start |
– |
3–10 kW |
For three-phase generators |
ES-TD-ATS31, ES-TD-ATS51, ES-TD-ATS61, ES-TD-ATS71, ES-TD-ATS81, ES-TD-ATS101 |
Exact parameters (Icw, Icm, transfer time, control voltage) can be found in each product description and in the manufacturer's datasheets.
⚠ What to check before buying
KibirkštisBefore choosing an ATS I always ask three things: how many phases, what main breaker and whether the generator starts by itself.
|
What to check |
Why it matters |
|
Number of phases and earthing system |
This decides 2P or 4P and whether N has to be switched. |
|
Main circuit breaker rating |
The ATS rated current must be not lower. |
|
Generator start |
Automatic start needs a controller with a start contact and a generator with a remote start input. |
|
Type of load |
For motors and compressors – utilisation category AC-33. |
|
PC or CB class |
PC class needs separate short-circuit protection upstream of the ATS. |
|
Delay settings |
The generator must have time to warm up, and short grid dips must not start it. |
|
Mounting location |
IP20 – only inside a closed enclosure; panel ATS – in a cabinet with enough space for cables. |
✗ Most common mistakes
|
Mistake |
Consequence |
|
The generator is connected “backwards” through a socket (plug-to-plug cable) |
⚡ The free plug pins are live; if the main switch is not opened, voltage feeds back into the grid – danger to people and line workers. |
|
A 3P ATS is used in a three-phase installation while the generator N is bonded to PE |
N and PE become parallel, part of the neutral current flows in the PE conductor, RCDs trip unexpectedly. |
|
The ATS is sized by generator power, not by the supply |
On grid supply the ATS is overloaded and overheats. |
|
A simple ATS without a controller is expected to start the generator |
Nothing happens on a power cut – the generator is not started. |
|
Zero delay is set |
The load is applied to a cold generator and it stalls; short dips start it for no reason. |
|
A PC class ATS without upstream protection |
The switch is destroyed during a short circuit. |
|
Three-phase loads are fed from a single-phase generator |
Motors do not start or overheat running on a missing phase. |
⚡ Safe installation – advice from Fazė
-
Connect a generator to the installation only through a switch that prevents parallel operation with the grid: mechanical and electrical interlock, position 0.
-
Before work, disconnect both the grid and the generator. The ATS controller may start the generator unexpectedly – switch off automatic mode.
-
Make the generator N–PE bond and earthing according to the manufacturer's instructions and the earthing system of the site.
-
Coordinate the connection of a stationary generator with the design and, where the connection conditions require it, with the grid operator. Work is carried out by a qualified electrician.
Diagrams: how it is often done and how it should be
In each diagram the most common mistake is on the left and the correct solution on the right. The numbers in the diagram match the explanations below it.
Diagram 1. Connecting a generator: via a socket or via an ATS. A generator must not be connected to a house installation in a way that lets its voltage reach the distribution grid or lets the grid and the generator meet.
KibirkštisDuring a power cut I plug the generator into a socket with a double-plug cable and everything works. What is wrong?
FazėThe free plug is at 230 V, and if the main switch is on, the generator also feeds the street line. When the grid returns, they meet. Connect only through an ATS or a 1-0-2 switch.
☝ Click the diagram to open the enlarged version.
⚠ This diagram is for guidance only and may contain inaccuracies. Before connecting, check against the manufacturer's instructions and the device markings.
The qualified electrician carrying out the installation is responsible for it. UAB „Elektrotechnikos sprendimai“ accepts no liability for connections or possible errors.
Why – explanation by the numbers in the diagram
1Connection through a socket
✗ plug-to-plug cable → ✓ the generator is connected only through an ATS or a 1-0-2 switch
Why: A socket outlet is meant for a load, not a source. With one end of the cable in the generator, the pins of the other plug are at 230 V and can be touched. Such a connection also bypasses the installation protection – the cable and the socket are not rated for the whole house load.
2Back-feed into the grid
✗ main switch not opened → ✓ position 0 and interlock separate the sources
Why: If the main switch is left on, the generator voltage passes through the meter into the distribution grid and can be stepped up by the transformer. Line workers who believe the line is dead can be injured. The design of an ATS or MTS does not allow both sources to be connected at the same time.
3Grid return
✗ grid and generator meet → ✓ the ATS transfers the load back to the grid itself
Why: If grid voltage returns while the generator is still connected, two unsynchronised sources are joined. Large equalising currents flow: generator windings, cables and contacts burn. An ATS first disconnects the generator and only then, after a delay, connects the grid.
Diagram 2. Three-phase installation: 3P or 4P ATS. In a three-phase installation it is important not only to switch the phases but also to decide what happens with the neutral. When the generator N is bonded to PE, N must be switched together with the phases.
KibirkštisWhy am I offered a 4P ATS when there are only three phases?
FazėThe fourth pole switches the neutral. Otherwise the N–PE points of the grid and the generator are connected in parallel – RCDs start tripping for no reason.
☝ Click the diagram to open the enlarged version.
⚠ This diagram is for guidance only and may contain inaccuracies. Before connecting, check against the manufacturer's instructions and the device markings.
The qualified electrician carrying out the installation is responsible for it. UAB „Elektrotechnikos sprendimai“ accepts no liability for connections or possible errors.
Why – explanation by the numbers in the diagram
1Switching N
✗ 3P ATS, N permanently connected → ✓ 4P ATS switches L1, L2, L3 and N
Why: With a 3P ATS the grid and generator neutrals stay permanently connected. Whichever source is supplying, both N–PE bonding points remain in one circuit. A 4P ATS disconnects the neutral together with the phases, so only one source with its own N–PE point is in operation.
2Parallel N and PE paths
✗ neutral current splits between N and PE → ✓ each source has one N–PE point
Why: When N and PE are bonded at two points, part of the operating neutral current flows through the protective conductor PE and the earth. The PE conductor is intended only for fault currents – continuous current in it causes interference, corrosion and dangerous potentials on metal structures.
3RCD operation
✗ the RCD trips for no reason → ✓ the RCD works correctly
Why: An RCD compares the current in the phase and N conductors. If part of the neutral current returns via PE, the RCD sees an imbalance and disconnects the circuit although there is no fault. With N switched, the neutral current returns only via N and the RCD reacts only to real leakage.
Diagram 3. Generator and hybrid solar inverter. A hybrid inverter with a battery is itself a backup source. The generator is connected to the inverter GEN input, not in parallel with the grid on GRID.
KibirkštisI connected the generator to the same GRID input as the mains – the inverter will sort it out, right?
FazėNo. The inverter can feed energy back into the generator and damage it, and when the grid returns the sources will be connected together. Connect the generator only to the GEN input or via an ATS.
☝ Click the diagram to open the enlarged version.
⚠ This diagram is for guidance only and may contain inaccuracies. Before connecting, check against the manufacturer's instructions and the device markings.
The qualified electrician carrying out the installation is responsible for it. UAB „Elektrotechnikos sprendimai“ accepts no liability for connections or possible errors.
Why – explanation by the numbers in the diagram
1Separating the sources
✗ grid and generator on one GRID input → ✓ grid to GRID, generator to GEN
Why: When both sources share one point, nothing separates the grid from the generator. The inverter GEN input has its own relay and control, so only one source works at a time.
2Start-up and reverse power
✗ the inverter exports energy into the generator → ✓ the inverter starts the generator via the G-Start contact
Why: A generator cannot accept energy back – its voltage regulator and windings get damaged. Connected to GEN, the inverter closes the G-Start dry contact by itself based on the battery state of charge and starts the generator only when needed.
3Grid return and load
✗ sources are connected when the grid returns → ✓ the load is supplied only from LOAD (EPS)
Why: An unsynchronised grid and generator connected together cause a short circuit. The load is connected only to the LOAD (EPS) output, and export in generator mode is disabled in the inverter settings.
Diagram 4. Automatic generator start. A simple ATS only transfers the load between voltages that are already present. For the generator to start by itself when the grid fails, you need an ATS controller and a generator with a remote start input.
KibirkštisI installed an ATS, the power went out and the generator just stands there. Why didn’t it start?
FazėA simple ATS has no start contact. You need a controller that monitors the grid, starts the generator via the START contact and transfers the load after the delays.
☝ Click the diagram to open the enlarged version.
⚠ This diagram is for guidance only and may contain inaccuracies. Before connecting, check against the manufacturer's instructions and the device markings.
The qualified electrician carrying out the installation is responsible for it. UAB „Elektrotechnikos sprendimai“ accepts no liability for connections or possible errors.
Why – explanation by the numbers in the diagram
1What controls the system
✗ ATS without a controller – only transfers → ✓ the controller monitors grid and generator voltage and frequency
Why: A modular ATS sees only the two voltages at its inputs. While the generator is not running, there is no voltage on the backup side, so there is nothing to transfer to. The controller monitors the grid and decides to start the generator.
2Start signal
✗ the generator receives no start signal → ✓ a two-wire START contact starts the generator
Why: The generator must have an electric starter and a remote start input. The controller dry contact closes – the generator starts and runs; it opens – the generator stops after cooling down.
3Transfer and return
✗ after a grid failure the load stays without power → ✓ after the delays the load is transferred and returned automatically
Why: The controller waits until generator voltage and frequency stabilise and only then transfers the load. When the grid returns, the load is transferred back after a delay, and the generator is cooled down and stopped.
Frequently asked questions
Questions from Kibirkštis – a young, curious electrician. Answers from Fazė – an experienced engineer.
KibirkštisDoes an ATS suit any generator?
FazėFor switching – yes, if the voltage and number of phases match. Automatic start is possible only for a generator with an electric starter and a remote start input – it is controlled by the ATS controller via the start contact.
KibirkštisHow long does the transfer take?
FazėBetween two sources that are already present – from tens of milliseconds to a few seconds, depending on the model. With a generator the total time depends on starting and delays, usually 10–60 s. If the load must not be interrupted even for a moment, a UPS is needed.
KibirkštisDoes an ATS protect against short circuits?
FazėPC class – no, circuit breakers or fuses are needed upstream. A CB class ATS already has protection.
KibirkštisDoes a house need 2P or 4P?
FazėSingle-phase supply – 2P, three-phase supply with neutral – 4P. 3P is used only for a three-phase load without N.
KibirkštisCan an ATS be used with a solar inverter?
FazėWith the backup (EPS) output of a hybrid inverter – yes, PV ATS units are made for that. An on-grid inverter shuts down when the grid fails, so it will not provide backup power.
KibirkštisCan I install it myself?
FazėAn ATS is connected in the main supply circuit, so it is installed by a qualified electrician. We will help you choose the switch, controller and protection.
KibirkštisDo you help select a complete set?
FazėYes. Send the supply details (phases, main breaker), generator power and start method – we will select a compatible solution and send an offer.
KibirkštisWhat size generator do I need for a house?
FazėIt depends on what you will power on backup. For a boiler, fridge, lighting and internet, 2–3 kW is enough, but adding a borehole pump already requires 6–7 kW due to its starting current. A calculation example is in the section
on load calculation.
KibirkštisWhy won't a gas boiler work on a generator?
FazėThe flame monitoring of many gas boilers relies on the potential difference between N and PE. If the generator neutral is “floating”, i.e. not bonded to PE, the boiler locks out with a flame fault. The solution is a correct N–PE bond on the generator side according to the earthing system. This must be done by an electrician.
KibirkštisCan a generator be connected to a hybrid inverter?
FazėYes, if the inverter has a GEN input or the manufacturer allows a generator on the GRID input. The inverter then starts the generator itself based on battery state of charge. Most importantly, the generator must never receive energy back from the inverter.
KibirkštisDoes a generator need ESO permission?
FazėIf the generator is connected only via an ATS or 1-0-2 changeover switch that fully disconnects the mains, it operates only autonomously and does not feed energy into the grid. Any operation in parallel with the grid, e.g. a solar power plant, requires connection conditions from ESO (the Lithuanian distribution network operator).
Sources
Prepared 2026-10-07 · Updated 2026-11-12.
This guide is for information only. UAB „Elektrotechnikos sprendimai“ accepts no responsibility for product selection based on this guide – the final choice is made by the designer or a qualified electrician based on the site data.