Products catalog

  • Modular three-phase electricity meter | CT-connected …/5 A | 1.5(6) A | 3×230/400 V | 1 tariff | pulse output | IP20 | DIN | THORGEON 01004

    Code: 01004

    Three-phase four-wire electronic meter connected via current transformers with 5 A secondary (1.5(6) A). Records active energy on lines whose current exceeds direct-connection limits. Intended for non-billing (internal) metering.

  • Modular three-phase electricity meter | CT-connected …/5 A | 1.5(6) A | 3×230/400 V | 1 tariff | pulse output | IP20 | DIN | THORGEON 01004

    THORGEON 01004 is a modular three-phase four-wire meter designed to be connected via current transformers (CTs) with a 5 A secondary. Rated measuring current is 1.5 A and maximum 6 A, so the metering limit is set by the chosen CTs, not by the meter itself.

    Key point:
    When an incomer or feeder is 150, 250 or 400 A, a direct-connected meter will not do. Together with …/5 A current transformers the 01004 records active energy on such lines while taking only 4 DIN modules. It is a solution for internal metering – the manufacturer does not state MID.
    Connection
    via CT …/5 A
    Current
    1.5(6) A
    Accuracy class
    B
    Pulses
    400 imp/kWh
    ℹ
    Bidirectional metering
    The manufacturer does not state that the meter records imported and exported energy separately. If energy exported to the grid must be metered separately via CTs, choose a bidirectional model, e.g. the Eastron SDM630MCT-2T with MID.

    Communication interfaces and integration

    Electrical pulse output (400 imp/kWh)
    Pulses are passed to a PLC, BMS or data logger; note that pulses relate to the CT secondary side, so the CT ratio must be applied in the system.
    Local LCD display
    Readings are taken at the board; there is no RS485, M-Bus or Wi-Fi interface.

    How it works

    The meter mounts on a DIN rail; phase voltages and neutral are connected directly, while the current circuits go through three current transformers with a 5 A secondary.

    The meter measures the CT secondary current (rated 1.5 A, max. 6 A) and records active energy on all three phases.

    Actual consumption is obtained by multiplying the LCD reading by the CT ratio in use (e.g. 200/5 A = ×40), unless the manual allows the ratio to be entered into the meter.

    Why choose the THORGEON 01004?
    It is a compact and economical way to meter high-current three-phase lines: the current limit depends on the CTs, so the same meter fits a 100 A feeder as well as an incomer of several hundred amps.

    Technical specifications

    Product type Modular three-phase electronic electricity meter
    Manufacturer / model THORGEON 01004
    Connection Via current transformers (…/5 A)
    Network type Four-wire (3P + N)
    Rated / maximum current 1.5 A / 6 A
    Rated voltage 3×230/400 V (230 V phase–N)
    Frequency 50–60 Hz
    Accuracy class B (accuracy class, not an MID certificate)
    MID No – for non-billing (internal) metering
    Tariffs 1 (internal control)
    Measured quantities Active energy (kWh)
    Pulse output Electrical, 400 imp/kWh
    Display Digital LCD
    Built-in battery Yes
    Mounting DIN rail, 4 modules
    Dimensions (W×H×D) 76 × 100 × 65 mm
    Degree of protection IP20
    Warranty 24 months

    Main functions

    • CT connection …/5 A – metering on lines above 100 A
    • Active energy metering – kWh reading on the LCD
    • 400 imp/kWh pulse output – signal to PLC or BMS
    • Four-wire scheme – 3 phases and neutral
    • Built-in battery – part of the manufacturer's design
    • 4-module housing – takes little space in the board

    How does it differ from similar models?

    THORGEON 01003 Direct connection up to 100 A; the 01004 is for higher currents via CTs.
    Eastron SDM630MCT-2T Via 1/5 A CTs, 2 tariffs, RS485 Modbus, MID and multifunction measurement; the 01004 is plain kWh metering without MID.
    Eastron SDM630MCT-ML-1 Via CTs, RS485 Modbus, MID; the 01004 has no digital interface.
    Eastron SMART X96-1 96×96 mm panel instrument via CTs with Modbus and MID; the 01004 is a modular DIN meter.

    Where is it used?

    • Company incomers 125–400 A
    • Production halls and compressor rooms
    • High-power tenant feeders in shopping centres
    • Boiler rooms and heat substations
    • Grain dryers and farm incomers
    • Upgrading existing CT schemes instead of induction meters

    Use by need

    Electricians.
    A simple CT meter for high-current lines, 4 DIN modules.
    Energy managers.
    Internal kWh metering of large consumers without an expensive analyser.
    Automation integrators.
    400 imp/kWh signal scaled by the CT ratio.

    Practical use

    If a production hall has a 250 A incomer and you want its monthly consumption, fit three 250/5 A current transformers and a THORGEON 01004 – multiply the LCD reading by 50 (if the ratio is not entered in the meter) to get actual kWh.

    Pros

    • Suits high-current lines via …/5 A CTs
    • Compact 4-module housing
    • 400 imp/kWh pulse output
    • Simple to use
    • 24-month manufacturer warranty

    Cons / limitations

    • No MID – for billing choose Eastron SDM630MCT-2T or SDM630MCT-ML-1
    • No RS485 / Wi-Fi interface
    • Current transformers must be purchased separately
    • The manufacturer does not state whether the CT ratio can be entered – manual scaling may be needed
    • Bidirectional metering not stated by the manufacturer

    Safety and installation notes

    • Installation by a qualified electrician only, with the supply disconnected
    • Never open a CT secondary circuit under load – short it first (dangerous voltage)
    • Observe CT orientation (P1/P2, S1/S2) and phase correspondence with the voltage circuits
    • Protect the voltage circuits with fuses or circuit breakers
    • IP20 – install only in a closed enclosure in a dry room

    Quick selection guide

    Via CT …/5 A
    1.5(6) A
    1 tariff, no MID
    400 imp/kWh
    A good fit when you need:
    • Internal metering on lines above 100 A
    • A compact CT meter in a DIN board
    • A pulse signal to automation
    Check before use:
    • That the CT secondary is 5 A and the accuracy class is suitable
    • That MID is not required
    • How the CT ratio will be applied to readings
    Important reminder: The meter works only with current transformers – it must not be connected directly into the power circuit; it also does not replace the operator's billing meter.

    FAQ

    Can it be connected directly?
    No, the 01004 connects only via current transformers with a 5 A secondary.
    Which CTs should be used?
    …/5 A current transformers sized to the line current.
    Is the meter MID approved?
    The manufacturer does not state MID – it is for internal metering.
    How do I get actual kWh?
    If the ratio is not entered, multiply the LCD reading by the CT ratio.
    How many pulses per kWh?
    400 imp/kWh on the secondary side.
    What is the warranty?
    The manufacturer specifies a 24-month warranty.

    THORGEON 01004 three-phase CT meter

    Three-phase four-wire electricity meter for …/5 A current transformers, 1.5(6) A, 3×230/400 V, class B, 400 imp/kWh, 4 DIN modules – for internal metering.

    Illustrative image may have been created using AI. The appearance of the product may differ slightly from the image shown. Please refer to the technical specification.
  • Alternative products

  • privacy policy

    Information