-
Product Catalog
- Security and Surveillance Systems | accessories
- Lighting solutions for industrial | commercial | residential | outdoor environments | accessories
-
Automation and Control Systems
-
Automation control accessories
- Time voltage deviation current level network control visualization relay
- Signal towers | beacons | modules | accessories
- Power and time control relays for home automation with integrated SCHUKO sockets, designed for alternating and direct current protection and for household users.
- Boxes for signaling equipment | Signal lights
- Cam switches | for devices on/off control
- Electric motor control | protection management
- Soft starter devices for electric motors
-
Energy meters
- Single-phase electricity meters | energy metering devices
- Three-phase electricity meters | energy metering devices
- Single-phase electrical energy meters | metering devices with current transformers CT
- Three-phase electricity meters | energy metering devices with current transformers CT
- DC electrical energy meters | with shunt
- Hour meters | operating time recording
- Control components for automation and control systems
- Signal converters | controllers for automation control | for control systems
- Touchscreens | panels for automation control | control systems
- Automatic Circuit Breakers for Direct Current (DC) Circuits with Integrated Overload, Short-Circuit, and Voltage Stabilization Protection Functions
- Automation and Electrical Control Components | Contactors | Relays | SSR | Accessories
- Automation control | Data transmission | Low current
- Industrial measurement | counting | detection systems for conveyors
- Panel heaters | protection for electrical equipment against moisture and cold
- Converters-transformers from single-phase to three-phase voltage
- Silicone strip heaters | electric heating solutions for industry
- Heating elements for liquids | water | oils | food heating
- Heating elements | igniters | for stoves | boilers | heaters
- Insulation Monitoring & Power Supply Equipment for Medical IT Systems
-
Automation control accessories
- Smart Automated Products | Control | Transmission | Detection
- Electrical distribution and installation
- Solar Energy Generation and Management Equipment
- HVAC control solutions for heating and ventilation
- Accessories for cars
- Workplace Safety | Electrical Safety Equipment | LOTO
- Technical maintenance | service equipment | fire protection solutions
- Emergency safety | hygiene | sanitary solutions
- Other products
- Quality used products
Energy meters
-
Electricity meters and energy metering devices for apartments, houses, businesses and industrial sites. Choose from single-phase and three-phase direct-connected meters, meters connected via current transformers (CT), MID-certified models, meters with RS485 Modbus, M-Bus, Ethernet or Wi-Fi, bidirectional and multi-tariff models.
-
Read more
Energy meter selection guide: from apartment to factory
This guide brings together all our metering devices – single-phase and three-phase, direct-connected and current transformer (CT) operated, DC meters with shunt and hour meters. Choose your situation or filter the matrix by type, communication and current.
What do you need?
Tenant or sub-metering
Choose an MID-approved model – its readings are suitable for billing.
→ Selection matrixHigh current, building, production
Three-phase CT meter – current set by the transformer.
→ Selection matrixFrom a simple to a professional solution
1. Basic metering
Direct-connected 1-phase or 3-phase meter with LCD – you know how much was consumed.2. Billing-grade metering
MID-approved meter – readings suitable for tenants and sub-metering.3. Remote monitoring
RS485 Modbus, M-Bus, Wi-Fi or S0 pulses – data to BMS, SCADA or an app.4. High current and industry
CT-operated meter – 100 A and more, without cutting cables.5. Special tasks
DC with shunt for solar and battery systems, hour meters for equipment maintenance.
KibirkštisKibirkštis advises: The quickest way to choose is to look at the main circuit breaker. If it is rated up to 63–80 A, a direct-connected meter is enough. At 100 A and above, choose a CT meter and select the transformers by the incoming current.
Selection matrix
Filter by type, communication and current – the table shows current prices and links to products.
FazėFazė warns:
- Never open the secondary circuit of a current transformer under load – a dangerous voltage develops.
- A meter does not protect against overload or short circuit – a circuit breaker is required upstream.
- Installation only by a qualified electrician after disconnecting and verifying that the circuit is de-energised.
Solution: With a CT meter use transformer terminal blocks with shorting links, and a correctly sized circuit breaker at the incomer.Related guides
Not found? Ask usSend us your current meter model, incoming current and communication needs – we will select the right meter or the complete set.
Send an emailUAB „Elektrotechnikos sprendimai“ accepts no responsibility for product selection based solely on this guide. The final decision and installation are made by a qualified electrician following the manufacturer documentation and applicable requirements.
Electricity meters – how to choose the right one
The right meter depends on three things: the supply current, the network (1 or 3 phases) and where the data has to go. Below you will find a quick selection guide, an overview of the groups, a separate section on CT-connected meters and the most common mistakes.
Colour key:blue – informationgreen – benefit and suitabilityorange – ⚠ checkred – ⚡ dangerous voltagepurple – communicationQuick selection by situation
Situation What to choose Where to look Apartment, cottage or a separate single-phase line Single-phase direct-connected meter Single-phase meters House, workshop or line with a three-phase supply up to 100 A Three-phase direct-connected meter Three-phase meters Current above 100 A or CTs already installed in the panel ⚡ Meter connected via current transformers Three-phase via CT Single-phase line where current is measured via a CT ⚡ Single-phase meter via CT Single-phase via CT Data must reach SCADA, BMS or a PLC Meter with RS485 Modbus RTU Eastron SDM630 Modbus V2, Selec MFM384-R-C Tenants are invoiced from the readings MID-certified meter Eastron SDM72D-M-MID, Schneider iEM3150 Import and export must be measured ⇄ Bidirectional meter Eastron SDM630 Modbus V2, EL-TVPS3-80T Direct current: EV charging, batteries DC energy meter DC 1000 V / 100 A Groups in this category
Single-phase electricity meters →
For apartments, cottages and separate single-phase lines. Direct connection, models with MID, Modbus and Wi-Fi. E.g. Eastron SDM120D-MID, THORGEON 01001.Three-phase electricity meters →
For houses, workshops and company lines up to 100 A: from simple kWh meters to multifunction meters with RS485 Modbus, M-Bus and several tariffs. E.g. Eastron SDM630 Modbus V2, ELGAMA GAMA 300 G3E.144, Zamel LEM-30.⚡ Three-phase via current transformers (CT) →
For high-current supplies, power distribution boards and building energy monitoring. Modular, multi-channel and panel-mount devices.⚡ Single-phase via current transformers (CT) →
For single-phase lines where current is measured via a transformer.DC meters and AC/DC indicators →
For direct-current circuits (EV charging, battery systems) and panel voltage / current / power indicators. They are listed in this group.⚡ Meters with current transformers (CT)
When the line current exceeds 100 A or the meter has to be installed in an existing power board, it is connected via current transformers. The CT reduces the line current to a standard 5 A or 1 A secondary current, and the meter recalculates it using the ratio set in the menu (e.g. 400/5). This way a single meter can measure a line of hundreds or thousands of amperes.
When to choose
Supply or line current above 100 A; CTs already installed in the panel; metering in the main power board or monitoring of several lines.How to select a CT
Primary current – by the maximum line current with a margin; secondary (5 A or 1 A) – the same as the meter input; the CT window must fit the cable or busbar.How to connect
P1 – on the supply side, S1 → start of the meter current input, S2 → end. Each phase has its own CT, and the phase sequence must match the voltage inputs.ℹ A sample wiring diagram with terminal numbers and the most common mistakes – see the Selec MFM384-R-C description.
Model Connection Communication Features Eastron SDM630MCT Modular, …/1 A or …/5 A RS485 Modbus RTU, 2 pulse outputs Multifunction, ⇄ import / export, THD Eastron SDM630MCT-2T Modular, …/1 A or …/5 A RS485 Modbus RTU 2 tariffs, MID Selec MFM384-R-C Modular, …/5 A (…/1 A), primary up to 10 kA RS485 Modbus RTU ⇄ Import / export, programmable PT ratio Carlo Gavazzi EM21 72D Modular, …/5 A, CT ratio up to 999 RS485 Modbus RTU, pulse Removable display, DIN or panel mounting ELGAMA GAMA 300 G3A.147 Transformer-operated, 5(10) A Depends on version 1 (C110) or 2 (F11) tariffs VEXEN ES3100DCT Modular, x/5 A, primary 1–9999 A Pulse output Simple kWh metering THORGEON 01004 Modular, 1.5(6) A via …/5 A CT Pulse, 400 imp/kWh Simple kWh metering, 1 tariff Schneider PM5110 / PM5330 Panel 96×96, via CT RS485 Modbus RTU Power analyser: power, energy, THD EARU EASEM-G-TY-W Modular, 3 CTs included (80–1000 A) Wi-Fi (Tuya), RS485 ⇄ Bidirectional, voltage and current protection TAC4371CT Modular, CT 100 / 150 / 200 A Ethernet / Modbus ⇄ Bidirectional, LCD display ME431Q4-2 Four-channel, DIN Modbus RTU / TCP, web server Several lines in one device MC60-GW30, 36-circuit meter Multi-channel, DIN, via CT RS485 Modbus Many lines – one device Panel 96×96 with Rogowski coil Panel, Rogowski coil RS485 Modbus Accuracy class 0.5S ⚡⚡ Dangerous voltage
An open CT secondary under load produces a dangerously high voltage and can damage the transformer. Always short-circuit the CT secondary terminals (S1–S2) before disconnecting the meter.Communication interfaces – how the data reaches your system
Interface Suitable for Examples Pulse output (S0) Simple energy counting to a PLC, controller or data logger THORGEON 01004, VEXEN ES3100DCT RS485 Modbus RTU SCADA, BMS, PLC, EV charger and other controller systems Eastron SDM630 Modbus V2, Selec MFM384-R-C, Eastron SDM72D-M-MID M-Bus Building metering systems with an M-Bus network VEXEN ESM3100DMB Ethernet / Modbus TCP Direct connection to the local network TAC4371CT, ME431Q4-2 Wi-Fi (Tuya / Smart Life) Monitoring in a mobile app, smart home EARU EASEM-G-TY-W, EL-TVPS3-80T 4G / LoRa Remote sites without a local network ESADW300, LoRa multi-channel meter ⚠ What to check before buying
Parameter What to check Why it matters Connection type Direct or via CT (…/5 A, …/1 A) Direct-connected meters usually handle up to 80–100 A; higher currents need CTs Current In / Imax E.g. 5(80) A, 10(100) A Imax must not be lower than the supply protection current Voltage and network type 230 V; 3×230/400 V; 3P4W or 3P3W Wrong type – wrong readings Accuracy class B (1), 0.5S Larger sites and analysis need a more accurate class MID Yes / no Required when billing is based on the readings Tariffs 1, 2, 4 or more When the price depends on the time of day Energy direction Single-direction or ⇄ bidirectional For import and export metering Communication S0, Modbus, M-Bus, Ethernet, Wi-Fi Must match your system Mounting DIN modules or panel 96×96 mm For planning space in the board ⇄Bidirectional metering
A bidirectional meter measures energy imported from and exported to the grid. Compatibility with inverter power / export control must be confirmed separately – bidirectional metering alone is not enough for that.⚠ Most common selection and wiring mistakes
Mistake Consequence ✗ Direct-connected meter chosen for a current above its Imax Terminals overheat, the meter fails ✗ CT installed backwards or S1/S2 swapped Negative power, energy counted as export ✗ CT and voltage input from different phases Wrong power and cos φ ✗ CT ratio not set in the menu Readings wrong by a fixed factor ✗ ⚡ CT secondary opened under load Dangerous voltage, CT damage ✗ Meter without MID used for billing tenants Readings are hard to justify on invoices ✗ RS485 A+/B− swapped or no 120 Ω at the end of the line No communication or intermittent data ⚡ Safe installation
- ⚡ Meters must be installed and connected only by a qualified electrician, with the power switched off and absence of voltage verified.
- ⚡ A CT secondary must never be opened under load – short-circuit the CT terminals before disconnecting the meter.
- Tighten the terminals of direct-connected meters to the torque specified by the manufacturer – a loose contact overheats.
- Protect the voltage measuring circuits according to the manufacturer's instructions.
- Follow the applicable electrical installation rules.
Frequently asked questions
What is the difference between a direct-connected and a CT-connected meter?
A direct-connected meter carries the full load current, so it is usually rated up to 80–100 A. A CT-connected meter measures only the 5 A or 1 A secondary current, so it suits lines of hundreds or thousands of amperes.Is MID certification required?
If tenants or other consumers are billed from the readings, choose a MID model. MID is not required for internal energy monitoring.Which CT ratio should I choose?
Choose the primary current by the maximum line current with a margin, e.g. 250/5 or 300/5 for a 250 A supply. The ratio is set in the meter menu.Can the meter be connected to SCADA or BMS?
Yes, if it has an RS485 Modbus RTU, M-Bus or Ethernet (Modbus TCP) interface. Check the register map and communication settings.Is a bidirectional meter suitable for inverter export limitation?
It measures energy imported from and exported to the grid, but compatibility with a specific inverter's control must be confirmed separately.How much space does a meter take in the board?
Single-phase modular meters usually take 1–2 DIN modules, three-phase meters 4 or more. Panel devices are mounted in a 96×96 mm cut-out.Need help choosing?
Send us the supply current, network type and where the data needs to go – we will select the right meter and, if needed, the current transformers. All meters are delivered in Lithuania, Latvia and Estonia.
No items found.





